Diamond Light Source
Synchrotron and Physics Research Facility – £17m. UK
- Synchrotron building installation manpower and project management (all trades).
- Stainless Steel Process and Mild Steel, plant & distribution pipe work, compressed air and vacuum drainage installation.
- Stainless steel hook-up and fit-out pipe work installation connecting, Basebuild process pipe work with accelerator.
- Design / Build of Beamline Laboratories cabins and services.
-
ISIS
Target Station 2
Neutron Physics Research – £4m. UK
- Installation of stainless steel cooling water and CDA pipework for Neutron target station.
- Stainless Steel Skid cooling systems and Demin Water for Neutron Target.
- Building and installation manpower and project management (all trades).
- Mice Project - Management and manpower contract for the building of Neutron Target Facility.
-
Atmel NTS
Semiconductor – £6m. UK
- High Purity Gas, Chemical & Vacuum piping and ATS Ductwork, and M+E installation in Class 100 Wafer Fab Cleanroom.
- Facility Management for all Hard and soft services of Semiconductor Wafer Fab.
- Decommissioning, Decontamination and production tool move-out of 350 tools & utility systems for 200mm Semiconductor Production.
-
Unite
Student Accommodation – £7m. UK
- Electrical and Mechanical Services Design / Build - Prefabrication and Installation.
- Installation of Accommodation Modules.
-
Nissan
Auto Industry – £2m. UK
- Electrical and Mechanical installations.
- Steelwork fabrication and installations.
- Equipment installation and Hook Up service installations.
-
Veolia Water
General Laboratories – £4m. UK
- Design / Build refurbishment of Laboratory and office buildings.
- Electrical and Mechanical services.
- Facility fit-out and Hook up services.
-
Drawn Metal
Scottish Parliament
General Construction – £2m. Scotland
- Specialist architectural steelwork fabrications and erection.
- Mechanical installation and engineering works.
-
Sheffield University
Nanotechnology – £1m. UK
- UHP / Mechanical Installation & Nanotech Cleanroom Tool Hook-up.
- General and Process ventilation and extract.
- Specialist gases installations.
-
Westfield, White City
Commercial – £15m. UK
- Pre-fabrication and Site Installation of Stainless steel, PVC pipe-work.
- Pre-fabrication of roof mounted Energy Centre modules.
- All works for the £2bn Retail Centre Complex.
-
Sanofi Synthelabo
Pharmaceutical – £2m. UK
- Boiler house / Mechanical installation base build and hook up.
- Process installation base build and hook services.
- For the Pharmaceutical facility Extension.
-
May Gurney
High Level Bridge
Listed Structure – £30m. UK
- Structural steel strengthening works and roadways.
- Mechanical Services Installations.
-
Potterton Myson
Radiators – £200k. UK
- Electrical and Mechanical installations.
- Steelwork fabrication and erection.
- Equipment installation.
-
UKAEA Harwell
Nuclear – £200k. UK
- Mechanical assembly and installation works.
-
Dunlop Tyres
Auto-Industry – £300k. UK
- Electrical and Mechanical installations.
- Steelwork fabrication and erection.
- Equipment installation.
-
Siemens NTS Semiconductor
– £2m. UK
- Solvents and Chemical distribution pipework systems and drainage base build.
- Equipment installations and hook up.
- Facility Management for all Hard and soft services of Semiconductor Wafer Fab.
- Decommissioning, Decontamination and production tool move-out of 350 tools & utility systems for 200mm Semiconductor Production.